| Project |
UCC Scope of Work |
Owner |
Final Completion Date |
Airfield Lighting |
| Williams Gateway Airport |
Construction of new apron lighting for two of the airports three runways |
Williams Gateway Airport |
June
2006 |
| Luke Air Force Base - Upgrade Approach Lighting |
Upgrade by replacement of approach lighting system. |
Luke Airforce Base |
March
2006 |
| Glendale Municipal Airport Runway and Taxiway Expansion |
Construction of Runway and Taxiway Lighting and Signing, including vault work and controls. |
Glendale Municipal Airport |
September 2006 |
| Chandler Heliport Electrical & Security Upgrades |
Construction of airfield electrical and fencing improvements for security upgrades. |
City of Chandler |
November
2002 |
| Pegasus Airpark |
Design services and Construction of Taxiway and Runway Lighting, including Vault Room Controls. |
Pegasus Airpark, Circle G |
February
2002 |
Commercial Buildings |
| 3113 N. Norfolk, Mesa AZ |
The design and construction of 4000sqft commercial office space and 5000sqft of warehouse space on 1¼ acres. |
R.T. Brown Mechanical |
February
2004 |
1837 N. Rosemont
Mesa, AZ 85205-3202 |
The design and construction of 8000sqft commercial office space and 15000sqft of warehouse space on 4 acres. |
Diversified Excavation |
June
2000 |
Rio Salado VOC Treatment Facility
Contract amount: $3,202,066.00 |
Construction of Water Treatment Facility |
US Army Corps of Engineers |
March 2009 |
Directional Boring |
| Superstition Freeway (US 60) Widening and Median Lighting |
Directional drilling services: FMS conduit installation; Ramp metering & Median Lighting conduit. |
Arizona DOT |
January
2007 |
| Luke Air Force Base - Upgrade Approach Lighting |
Directional Bore under active taxiway to facilitate installation of approach lighting - Install 16", 12" & 10" steel casing with 4" PVC conduit. |
Luke Air Force Base |
March
2006 |
ITS / Fiber Optics |
| Tatum & McDonald |
Construction of traffic signal and fiber optic improvements, including directional boring work. |
McDOT |
January
2006 |
| City of Glendale Fiber Optic Communications Network |
Conduit Installation |
Arizona DOT |
February
2004 |
| State Highway Phoenix Freeway Management System |
Construction Fiber Optic Improvements, including directional boring work. |
Arizona DOT |
October
2001 |
High Voltage |
| Fort Huachuca Powerline Conversion |
Beautification project - conversion of overhead powerlines to underground. |
Fort Huachuca |
1992 |
Electrical, Lighting & Traffic Signals |
| Fountain Hills Traffic Signal at Saguaro Blvd. & El Lago Blvd. |
Construction of Traffic Signal, asphalt paving and concrete work. |
City of Fountain Hills |
July 2006 |
| Ellsworth Road Improvements - Phase 2 |
Construction of Traffic Signal, Street Lighting and Fiber Optic Improvements |
McDOT |
August 2006 |
| Ellsworth Road Improvements - Phase 1 |
Construction of Traffic Signal, Street Lighting and Fiber Optic Improvements |
McDOT |
January
2005 |
| Cooper & Ocotillo Traffic Signal |
Construction of Traffic Signal at existing intersection (partially owner supplied materials) |
City of Chandler |
August
2005 |
| Red Mountain Freeway Continuous Lighting |
Construction & Upgrade of Freeway Mainline & Ramp Lighting. |
Arizona DOT |
September
2005 |
| Chandler Traffic Signals Group I, II and III |
Construction of Traffic Signals at Twenty (21) Intersections (Partially owner supplied materials) |
City of Chandler |
January
2003 |
VA Medical Center
Contract amount: $3,385,222.17 |
Replacement & Installation of Electrical Equipment (Switchboards, Panels, Transformers, etc.) |
Department of Veteran Affairs |
March 2010 |
Airfield Rubber Removal |
Rubber Removal & Striping ID/IQ
Contract amount: $249,994.84 |
Rubber Removal, Painting and Striping |
Davis Monthan AFB |
Ongoing, 2 Yr. Contract, Ending November 2011 |
Road Grading |
Soil Stabilizer San Luis II
Contract amount: $242,475.00 |
Apply Soil Stabilizer to 17.1 Miles of Patrol Roads in U.S. Border Patrol Yuma Sector |
US Army Corps of Engineers |
December 2009 |
Water & Sewage |
Operations and Maintenance of Industrial Waste Water Treatment Facility IWWPTP
Contract Amount: $263,294.86 |
Operations and Maintenance of the Industrial Waste Water Pre-Treatment Facility |
Davis Monthan AFB |
Ongoing, 5 Yr. Contract, Ending November 2012 |
Remove & Replace 31 Water Valves
Contract Amount: $529,379.95 |
Installation & Removal of 31 Various Size Water Valves at Luke AFB |
Luke AFB |
January 2010 |
Replacement of 6" Water Main
Contract Amount: $377,706.52 |
Replace & Install 6" Water Lines at Luke AFB |
Luke AFB |
February 2010 |
Installation of Eleven Backflow Devices – Fire Suppression System
Contract Amount: $293,492.97 |
Install 11 New Backflow Devices on Fire Suppression Systems at Various Locations on Luke AFB |
Luke AFB |
March 2010 |